← All scenarios

Spaghetti Scenarios · Global risk

Climate change

Earth is warming because of the gases we release when we burn fossil fuels. The line starts at today's warming and follows where it would go depending on what humanity does. Move it and see when it crosses the +1.5 °C threshold, how far it moves past it, and which Semiversal state it lands in. A line is a direction, not a date.

1.37 °CHuman-caused warming (2025)
~2030projected crossing of +1.5 °C
View from

Warming trajectory

Tipping points · the risk grows with every tenth of a degree (uncertain probability)1 °C2 °C3 °C4 °C5 °C6 °C20252040206020802100Sustained crossing of +1.5 °Ctoday2.0 °C
Year: 2050

Crossing +1.5 °C

Sustained human-caused warming above +1.5 °C, measured as a twenty-year average

Impact
Major (4)
Probability
Almost certain (5)
Timeframe
Crossing projected around ~2030
Score
20
Confidence
High
Reversibility
Partially reversible or persistent
Signals
  • Annual and decadal temperature anomaly
  • Remaining carbon budget: ~170 GtCO₂ from early 2026 (Global Carbon Budget 2025)
  • Sea ice extent
  • State of the AMOC
  • Coral bleaching
  • Sea level

Tipping points

Irreversible triggering of one or more tipping points: Greenland, West Antarctica, the AMOC or the Amazon

Impact
Catastrophic (5)
Probability
Uncertain
Timeframe
Undetermined; the risk grows with every tenth of a degree
Score
N/A
Confidence
Medium for the mechanism; low for the probability
Reversibility
Irreversible on a human timescale
Signals
  • State of the AMOC
  • Mass balance of Greenland and West Antarctica
  • Amazon die-off

Effective mitigation

The bright side of the same scenario: the higher-action pathways are the ones that would make it happen.

Probability
Uncertain
Confidence
Medium

The matrix, as in the Excel file

Change impact and probability to see where the scenario lands. Up above, the physics moves; here, the rating moves.

Impact ↓ · Probability →RemoteUnlikelyPossibleVery likelyAlmost certainCatastrophicMajorModerateMinorNegligible
I × P score (baseline)20
Weighted risk R% (Excel)72%

Certainty 81%–100%. The Excel file uses the midpoint 90%; baseline v0.9.1 (sec. 6.2) dropped midpoints, so R% is shown for comparison only.

Matriz de escenarios.xlsx (sheet 'Valuación y ponderación', i.e. valuation and weighting): R% = midpoint P × I / 5. Baseline v0.9.1 sec. 6.2 dropped the use of midpoints; the official score is I × P (1–25).